Energy mass balanceCostingEquipment sizingOther
Industrial electric boiler (electrode or resistive) - levelised cost of steam
Electrode or resistance boiler for saturated steam or hot water: heat, steam tonnage and electricity per year, installed CAPEX with grid connection on DEA 2025 or SINTEF 2025, and the levelised cost of heat in EUR/MWh_th against a gas boiler fuel + CO2 benchmark.
- CurrencyEUR 2025
- Battery limitinstalled
- 73 documented assumptions
- Updated27 Oct 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Equivalent hours per year at rated power. 8,000 h is baseload process steam. 500 h is DEA's flexible duty (peak load and system services at cheap-power hours). The maximum, 8,639 h, is what the DEA outages leave: (8,760 - 0.2 weeks x 168 h) x (1 - 1 % forced outage).
Flows
- In: Electricity—
- In: Boiler feedwater—
Asset
Industrial electric boiler (electrode or resistive)
- Out: Heat (saturated steam or hot water)—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Heat output of the boiler installation at full load, the DEA basis ('generating capacity, MW of heat'). Electric input is 1 % higher (99 % efficiency) plus 0.5 % auxiliaries. Resistance boilers cover the low end (DEA: up to 1-2 MW at low voltage), electrode boilers (10-15 kV) the rest, 0-60 MW per unit. The range 0.05-75 MW contains the catalogue products (Parat IEH compact 0.05-8 MW, ACME CEJW 2.5-68 MW, Parat IEH high voltage up to 75 MW). Costs are sourced between 1 and 40 MW (DEA) and up to 50 MW (SINTEF fit); outside 1-40 MW the CAPEX is an extrapolation of the scale law and the page flags it.
- Electric input at rated power
- — MW
- Steam flow at rated power
- — t/h
- Heat delivered
- — MWh/year
- Number of boiler units
- — units
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 20 MW
SINTEF 2025 Table 4
Model value: the reference case CAPEX scaled to the rated power. Customized: your own installed figure (vendor or EPC quote), used as is at every size and no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed· this figure
- Fully financed
Included
- Equipment
- Installation, civil works and engineering
Not included
- Working capital
- Contingency
Added at project level
- Working capital layer, from the project settings
- Contingency, from the project settings
Project figures
Values passed to project mode when this asset is added to a project.
Industrial electric boiler (electrode or resistive)Concept sketch, not to scale · drag to rotate
- Electricity in
- —
- Boiler feedwater in
- —
- Heat (saturated steam or hot water) outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 20 years
Log in to add this asset to a project.
Levelised cost of heat
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- LCOH - capital—
- LCOH - fixed O&M—
- LCOH - variable O&M—
- LCOH - electricity—
Linked to the balance above
Equivalent hours per year at rated power. 8,000 h is baseload process steam. 500 h is DEA's flexible duty (peak load and system services at cheap-power hours). The maximum, 8,639 h, is what the DEA outages leave: (8,760 - 0.2 weeks x 168 h) x (1 - 1 % forced outage).
Delivered price excluding VAT and recoverable taxes: energy, network and capacity charges, levies. Default 121.7 EUR/MWh is Eurostat's EU27 band IF (70-150 GWh/year) for 2025-S2. Range 60-184: from France band IG (61.4) to the EU band IC (183.7). Network and capacity charges are inside this price, so they are not a separate line. Spot prices below 60 EUR/MWh in flexible operation are outside this range: no source for a flexible-mode delivered price was found.
Saturated steam delivered. Sets the steam enthalpy (NIST: 2,706.2, 2,780.8 and 2,803.2 kJ/kg), hence the tonnes of steam per MWh. The heat cost per MWh does not depend on it. For hot water, read the heat results and ignore the steam tonnage.
Temperature of the water entering the boiler. 105 C is deaerated make-up and condensate return; 20 C is cold make-up without return. It must stay below the saturation temperature of the chosen pressure (120 C at 2 bar).
For the gas boiler benchmark only. Delivered price on a gross calorific value (PCS) basis, excluding VAT. Default 48.3 EUR/MWh is Eurostat's EU27 band I4 (100,000-999,999 GJ/year) for 2025-S2; France 44.8.
For the gas boiler benchmark only. Default 73.43 EUR/t is the 2025 average EU ETS allowance price (Instrat); IEA uses 80 EUR/t for Germany. Sites outside the EU ETS (under 20 MW thermal input) pay no allowance today: the benchmark then overstates the gas cost by its CO2 part.
Real rate for the capital annuity, as a fraction. Default 5 % is SINTEF's (2025). All costs are in constant 2025 EUR, so the rate is real.
Annuity period. Default 20 years is DEA's technical lifetime for 2025 (25 years from 2030); SINTEF uses 15.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Specific CAPEX (installed), EUR/MW
70,000 DEA data sheet 41 large
154,570 DEA data sheet 41 small
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
61 outputs · 5 groups · 15 also shown above, dimmed
Levelised cost of heat
11- Electricity share of LCOH
- Computing%
- Cost of steam
- ComputingEUR/t
- LCOH at 500 full-load hours
- ComputingEUR/MWh_th
- LCOH at the French IG band price
- ComputingEUR/MWh_th
- LCOH at the EU IC band price
- ComputingEUR/MWh_th
- LCOH at the IEA German electricity cost
- ComputingEUR/MWh_th
Gas boiler benchmark
10- Gas boiler benchmark (fuel + CO2)
- ComputingEUR/MWh_th
- Gas benchmark - fuel
- ComputingEUR/MWh_th
- Gas benchmark - CO2
- ComputingEUR/MWh_th
- Gas benchmark at 93 % efficiency
- ComputingEUR/MWh_th
- Gas benchmark at 80 EUR/t CO2
- ComputingEUR/MWh_th
- Gap to the gas benchmark
- ComputingEUR/MWh_th
- Break-even electricity price
- ComputingEUR/MWh
- Gas price on NCV
- ComputingEUR/MWh
- Gas CO2 factor
- Computingt/MWh
- Direct CO2 avoided vs gas
- Computingt/year
Capital and O&M
17- Reference-case CAPEX at 20 MW
- ComputingEUR/MW
- SINTEF fit at this size
- ComputingEUR/MW
- DEA size-class CAPEX
- ComputingEUR/MW
- Gap to the DEA size class
- Computing%
- Boiler equipment share of CAPEX
- Computing%
- Total installed CAPEX (MEUR)
- ComputingMEUR
- Boiler equipment CAPEX
- ComputingEUR
- Installation and grid connection CAPEX
- ComputingEUR
- Capital recovery factor
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
- Variable O&M per MWh
- ComputingEUR/MWh_th
- Electricity cost
- ComputingEUR/year
- Total annual cost
- ComputingEUR/year
Heat and electricity
15- Electricity consumed
- ComputingMWh/year
- Auxiliary electricity
- ComputingMWh/year
- Boiler electricity per MWh of heat
- ComputingMWh/MWh
- Auxiliary load factor
- Computingratio
- Electricity per MWh of heat
- ComputingMWh/MWh
- Overall efficiency
- Computing%
- Load hours
- Computingh/year
- Maximum full-load hours
- Computingh/year
- Capacity factor
- Computing%
- Share of available hours
- Computing%
- Size outside cost sources
- Computingbool
Steam
8- Steam yield
- Computingt/MWh_th
- Steam produced
- Computingt/year
- Steam enthalpy
- ComputingkJ/kg
- Saturation temperature
- ComputingC
- Feedwater enthalpy
- ComputingkJ/kg
- Enthalpy rise
- ComputingkJ/kg
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
73 documented assumptions · 9 sources
- ens.dkDanish Energy Agency, Technology Data for Generation of Electricity and District Heating, ch. 41 Electric boilers (pp. 216-221)types, unit sizes, ~500 full-load hours
- ens.dkDanish Energy Agency, data sheets 41 Electric boiler small/large and 44 Natural gas DH onlyefficiency, outages, CAPEX split, O&M (2025 EUR)
- arxiv.orgGalteland, Hadler-Jacobsen, Kauko (SINTEF), Techno-economic optimization of hybrid steam-electric energy systems, arXiv:2506.14252 (2025)cost power law, maintenance, steam balance
- webbook.nist.govNIST Chemistry WebBook, thermophysical properties of watersaturation and isobar enthalpies
- ec.europa.euEurostat nrg_pc_205, non-household electricity prices excl. VAT, 2025-S2 bands IC-IG
- ec.europa.euEurostat nrg_pc_203, non-household gas prices excl. VAT, band I4, 2025-S2 (GCV)
- ipcc-nggip.iges.or.jpIPCC 2006 Guidelines Vol. 2 Ch. 2 (natural gas 56,100 kg CO2/TJ) and Ch. 1 (NCV about 10 % below GCV)
- iea.orgIEA, Can low-temperature heat in factories be electrified competitively? (Dec 2025)efficiencies, German electricity cost and CO2 price
- energy.instrat.plInstrat, EU ETS 2025 summary2025 average allowance price 73.43 EUR/t
About
Calculator context
About
Calculator context
A screening model of an industrial electric boiler, electrode (above a few MW, 10-15 kV) or resistance (below), producing saturated steam or hot water, built for a feasibility study that has to stand in front of a lender. It is the simplest way to electrify steam, and its cost is driven almost entirely by the electricity price and the grid connection. Performance comes from the Danish Energy Agency (DEA) Technology Data sheets 41: 99 % efficiency, 0.5 % auxiliary electricity, 1 % forced and 0.2 weeks a year planned outage, which caps a year at 8,639 full-load hours. Steam follows an enthalpy balance on NIST properties at 2, 11 or 30 bar abs from the chosen feedwater temperature. Two sourced reference cases set the costs: DEA's 2025 large-class electric boiler (70,000 EUR/MW installed at 20 MW: 40,000 equipment, 30,000 installation, electrical integration and grid connection fees; 1,137.8 EUR/MW/year fixed and 0.70-0.81 EUR/MWh variable O&M) and SINTEF's 2025 fit over five sources (152 EUR/kW x (P/1 MW)^-0.296, maintenance 2 % of investment). Both scale with SINTEF's 0.704 cost exponent; a customized installed figure is used as is. The CAPEX is installed, exported to project mode with battery_limit = installed.
At 20 MW, 8,000 h, 121.7 EUR/MWh (Eurostat EU band IF, 2025-S2), 5 % and 20 years, the DEA case gives 125.1 EUR/MWh_th: 123.5 electricity, 0.70 capital, 0.14 fixed and 0.70 variable O&M, or 81.3 EUR per tonne of 10 barg steam (1.539 t/MWh). A gas boiler burning gas at 48.3 EUR/MWh GCV with CO2 at 73.43 EUR/t costs 78.7 EUR/MWh_th in fuel and CO2 alone; the electric boiler matches it below an all-in electricity price of 76 EUR/MWh. In DEA's 500-hour flexible duty the same boiler costs 137.7 EUR/MWh_th at the same price.
Read it with its limits: constant prices and a real annuity, no hourly price profile, no thermal storage. Costs are sourced from 1 to 40 MW (DEA) and up to 50 MW (SINTEF); outside that range the CAPEX is an extrapolation and the page flags it. A dedicated HV substation or grid reinforcement is in no source used here and is not included. The gas benchmark leaves out the gas boiler's capital. DEA and SINTEF differ by 10 % at 20 MW, and DEA's small class (154,570 EUR/MW, with a transformer station) sits well above the scale law at 5 MW: both are shown.
Model
135 variables — inputs, calculations and outputs, with their dependencies.
Model
135 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 20 | MW | — | |
| 8000 | h/year | — | |
| 1 | — | — | |
| 0 | — | — | |
| 70000 | EUR/MW | — | |
| 121.7 | EUR/MWh | — | |
| 2 | — | — | |
| 105 | C | — | |
| 48.3 | EUR/MWh | — | |
| 73.43 | EUR/t | — | |
| 0.05 | ratio | — | |
| 20 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(<=)+(>(-*)*(-*))+(!=)*(!=)+(<)+(>)+(>=)*(<=)+(<)+(!=)*(!=)*(!=)+(<=)+(==)*(>=)+(==)*(>=)+(==)*(>=)+(<)+(<)+(<)+(>=)+(<)>,,) | bool |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
(-*)*(-*) | h/year | ||
clamp(,,) | h/year | ||
/* | % | ||
/max(,)* | % | ||
* | MWh/year | ||
ceil(/) | units | ||
if((<)+(>)>,,) | bool | ||
/max(*,) | MWh/MWh | ||
+*** | ratio | ||
* | MWh/MWh | ||
/max(,) | % | ||
* | MW | ||
* | MWh/year | ||
** | MWh/year | ||
- | MWh/year | ||
if(==,,if(==,,)) | kJ/kg | ||
if(==,,if(==,,)) | C | ||
+*(-) | kJ/kg | ||
- | kJ/kg | ||
*/max(*,) | t/MWh_th | ||
* | t/h | ||
* | t/year | ||
| t/year | ||
if(==,**(/)^,) | EUR/MW | ||
if(>=,,clamp(*(/)^(-),,)) | EUR/MW | ||
**(/)^ | EUR/MW | ||
if(<=,,) | EUR/MW | ||
(/max(,)-)* | % | ||
if(<=,/max(+,),/max(+,))* | % | ||
* | EUR | ||
** | EUR | ||
- | EUR | ||
/ | MEUR | ||
if(<,/max(,),(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
if(==,**,*) | EUR/year | ||
if(==,,if(<=,,)) | EUR/MWh_th | ||
* | EUR/year | ||
* | EUR/year | ||
+++ | EUR/year | ||
/max(,) | EUR/MWh_th | ||
/max(,) | EUR/MWh_th | ||
/max(,) | EUR/MWh_th | ||
/max(,) | EUR/MWh_th | ||
/max(,) | EUR/MWh_th | ||
/max(,)* | % | ||
/max(,) | EUR/t | ||
(+)/max(*,)++* | EUR/MWh_th | ||
-+* | EUR/MWh_th | ||
-+* | EUR/MWh_th | ||
-+* | EUR/MWh_th | ||
/max(,) | EUR/MWh | ||
*/ | t/MWh | ||
/max(*,) | EUR/MWh_th | ||
*/max(*,) | EUR/MWh_th | ||
+ | EUR/MWh_th | ||
(+*)/max(*,) | EUR/MWh_th | ||
+*/max(*,) | EUR/MWh_th | ||
- | EUR/MWh_th | ||
(---)/max(,) | EUR/MWh | ||
/max(*,)* | t/year |
Assumptions
73 assumptions used in the calculations
Assumptions
73 assumptions used in the calculations
Protects divisions against a zero denominator.
Market range Not applicable (numerical guard).
0.000001Numerical constantUsed in guards and flags, so no number is written inline.
Market range Not applicable (literal zero).
0Numerical constantUsed in the CRF, ratios and flags.
Market range Not applicable (literal one).
1Numerical constantConverts fractions to percent.
Market range Exact by definition.
100%Unit conventionConverts percent inputs and constants to fractions.
Market range Exact by definition.
0.011/%Unit conventionUpper limit of operating hours and basis of the capacity factor.
Market range Exact by definition.
8760h/yearUnit conventionConverts the DEA planned outage, given in weeks per year, into hours.
Market range Exact by definition.
168h/weekUnit conventionEnergy unit conversion in the steam yield.
Market range Exact by definition.
1000kWh/MWhUnit conventionConverts heat in kWh into kJ to divide by the steam enthalpy rise in kJ/kg.
Market range Exact by definition.
3600kJ/kWhUnit conventionMass conversion.
Market range Exact by definition.
1000kg/tUnit conventionConverts the SINTEF cost coefficient, given per kW, into EUR/MW.
Market range Exact by definition.
1000kW/MWUnit conventionDisplays the CAPEX in million EUR.
Market range Exact by definition.
1000000EUR/MEURUnit conventionConverts the IPCC emission factor (kg/TJ) into t/MWh with kg_per_t.
Market range Exact by definition.
0.0036TJ/MWhUnit conventionReference case 1: Danish Energy Agency Technology Data, electric boilers (chapter 41), 2025 cost data.
Market range Not applicable (selector).
1Selector codeReference case 2: SINTEF 2025 power-law fit of electrode boiler investment and 2 % maintenance.
Market range Not applicable (selector).
2Selector codeSteam service 1: saturated steam at 2 bar abs (about 1 barg).
Market range Not applicable (selector).
1Selector codeSteam service 2: saturated steam at 11 bar abs (about 10 barg).
Market range Not applicable (selector).
2Selector codeSteam service 3: saturated steam at 30 bar abs (about 29 barg).
Market range Not applicable (selector).
3Selector codeHeat delivered per unit of electricity drawn by the boiler itself (electrode or resistance), nameplate and annual average alike: an electric boiler has no part-load efficiency drop.
Market range 98 % (IEA 2025) to 99 % (DEA).
99%DEA data sheet 41Pumps, feedwater, controls and cooling of the electrical equipment, as a share of heat generated. Counted in the electricity drawn, so it is paid at the electricity price.
Market range No independent range cited.
0.5%DEA data sheet 41Unplanned unavailability; caps the full-load hours.
Market range No independent range cited.
1%DEA data sheet 41Planned maintenance stop; caps the full-load hours.
Market range No independent range cited.
0.2weeks/yearDEA data sheet 41Enthalpy of the steam leaving the boiler for the low-pressure service.
Market range2,706.2kJ/kgNIST saturation tableFeedwater must stay below the saturation temperature, otherwise it would flash before the boiler.
Market range Exact property.
120.21CNIST saturation tableDefault service, about 10 barg, typical of process steam networks (Infraserv Hoechst units run at 16 barg).
Market range2,780.8kJ/kgNIST saturation tableUpper limit of the feedwater temperature for the 11 bar service.
Market range Exact property.
184.21CNIST saturation tableHigh-pressure service: saturated steam at its enthalpy maximum, the most heat per kg the boiler can put in saturated steam. Above 30 bar the enthalpy falls slightly (2772 kJ/kg near 70 bar), so this service gives the lowest steam yield of the range.
Market range2,803.2kJ/kgNIST saturation tableUpper limit of the feedwater temperature for the 30 bar service.
Market range Exact property.
233.86CNIST saturation tableAnchor of the feedwater enthalpy at 105 C, a deaerated make-up water temperature.
Market range Exact property.
441kJ/kgNIST isobarTemperature at which the feedwater enthalpy anchor is read.
Market range Exact.
105CNIST isobarShifts the feedwater enthalpy away from the 105 C anchor. A linear approximation, hence medium.
Market range4.19kJ/kg/KDerived from NISTDEA total for the 1-10 MW class, read as installed (equipment + installation + grid connection fees). Used for the DEA size-class comparison and as a benchmark.
Market range SINTEF fit at 5 MW: about 94 000 EUR/MW.
154570EUR/MWDEA data sheet 41 smallEquipment share of the small class (56.5 %), used to split the CAPEX up to 10 MW.
Market range No independent range cited.
87366EUR/MWDEA data sheet 41 smallInstallation and grid connection share of the small class (43.5 %).
Market range No independent range cited.
67204EUR/MWDEA data sheet 41 smallCost anchor of reference case 1 at its 20 MW reference size: installed electrode boiler with switchgear, installation and grid connection fees. DEA quotes it for about 500 full-load hours a year.
Market range 62 700 (SINTEF fit) to 70 000 EUR/MW at 20 MW.
70000EUR/MWDEA data sheet 41 largeEquipment share of the large class (57.1 %), used to split the CAPEX above 10 MW.
Market range No independent range cited.
40000EUR/MWDEA data sheet 41 largeInstallation and grid connection share of the large class (42.9 %).
Market range No independent range cited.
30000EUR/MWDEA data sheet 41 largeSelects which DEA class gives the equipment share, the variable O&M and the size-class comparison.
Market range Exact.
10MWDEA data sheet 41Reference size of the scale law: the size of the DEA large-class cost anchor.
Market range Exact.
20MWDEA data sheet 41 largeBelow 1 MW no source costs a boiler: the CAPEX is an extrapolation of the scale law and the size is flagged.
Market range Exact.
1MWDEA data sheet 41 smallAbove 40 MW the DEA cost range ends: the CAPEX is an extrapolation and the size is flagged.
Market range Exact.
40MWDEA data sheet 41 largeNumber of units needed for the rated power.
Market range 60 (DEA) to 75 MW (Parat IEH) per unit.
60MWDEA catalogue ch. 41Published exponent with its reference size, applied to the installation rated power. A fit on five literature points, money year not stated, hence medium. Below 1 MW and above 50 MW it is an extrapolation, flagged on the page.
Market range 0.43 (DEA class pair, different scopes) to 0.704 (SINTEF fit).
0.704SINTEF 2025 Table 4Cost anchor of reference case 2. Money year not stated in the paper, hence medium.
Market range No independent range cited.
152EUR/kWSINTEF 2025 Table 4Used to carry the SINTEF coefficient from 1 MW to the 20 MW reference size and to draw the SINTEF curve at any size.
Market range No independent range cited.
-0.296SINTEF 2025 Table 4Reference size of the SINTEF power law.
Market range Exact.
1MWSINTEF 2025 Table 4Fixed O&M of reference case 2.
Market range 1 137.8 (DEA) to about 1 250 EUR/MW/year (SINTEF at 20 MW).
2%SINTEF 2025Fixed O&M of reference case 1, per MW of heat capacity.
Market range 1 137.8 (DEA) to about 1 250 EUR/MW/year (SINTEF).
1,137.8EUR/MW/yearDEA data sheet 41Variable O&M of reference case 1 up to 10 MW, per MWh of heat.
Market range0.81EUR/MWhDEA data sheet 41 smallVariable O&M of reference case 1 above 10 MW.
Market range0.7EUR/MWhDEA data sheet 41 largeFloor of the clamp on the scaled specific CAPEX. A guard only, not a cost.
Market range Not applicable (guard).
20000EUR/MWNumerical guardCeiling of the clamp on the scaled specific CAPEX. A guard only, not a cost.
Market range Not applicable (guard).
1000000EUR/MWNumerical guardLow-price sensitivity: a very large French consumer.
Market range61.4EUR/MWhEurostat nrg_pc_205High-price sensitivity: a small consumer, the band a sub-MW boiler site pays.
Market range183.7EUR/MWhEurostat nrg_pc_205Sensitivity at the IEA German electricity cost.
Market range161EUR/MWhIEA 2025Flexible-mode sensitivity: the LCOH at DEA's 500 h.
Market range 500 h (DEA) to about 1 750 h (IEA hybrid).
500h/yearDEA catalogue ch. 41Converts the Eurostat gas price, quoted on GCV (PCS), to the NCV (PCI) basis of the boiler efficiency and of the emission factor.
Market range About 0.90 (IPCC).
0.9ratioIPCC 2006 Vol. 2 Ch. 1Direct CO2 of the gas boiler benchmark and of the avoided emissions.
Market range IPCC 95 % interval 54 300-58 300 kg/TJ.
56100kg/TJIPCC 2006 Vol. 2 Ch. 2Efficiency of the gas boiler benchmark (NCV basis).
Market range 87 % (IEA, industrial) to 93 % (DEA, district heating).
87%IEA 2025Sensitivity of the gas benchmark at the DEA district-heating efficiency.
Market range93%DEA data sheet 44Sensitivity of the gas benchmark at the IEA CO2 price.
Market range80EUR/tIEA 2025Not used in the formulas: published as the convergence check of the DEA efficiency.
Market range98%IEA 2025Not added: the auxiliary electricity is already in the electricity drawn and paid at the user's price. Adding this line would count it twice.
Market range Not applicable.
0.14EUR/MWhDEA data sheet 41Default of the economic lifetime and the service life exported to project mode.
Market range 15 (SINTEF) to 25 years (DEA 2030).
20yearsDEA data sheet 41Default electricity price: a 20 MW boiler at 8,000 h draws about 162 GWh/year, at the IF/IG boundary.
Market range121.7EUR/MWhEurostat nrg_pc_205Default gas price of the benchmark.
Market range48.3EUR/MWhEurostat nrg_pc_203Default CO2 price of the benchmark.
Market range73.43EUR/tInstrat 2026Default real discount rate.
Market range No independent range cited.
0.05ratioSINTEF 2025Screening model of one boiler installation: heat = rated power x full-load hours; electricity = heat / 99 % + 0.5 % auxiliaries; saturated steam from feedwater by an enthalpy balance; installed CAPEX scaled with SINTEF's 0.704 exponent from a 20 MW anchor; real annuity, constant prices. No part-load efficiency drop (an electric boiler has none at the scale of this model), no thermal storage, no hourly price profile.
Market range Not applicable.
—Model scopeThe CAPEX is installed, not ex-works and not all-in financed: it is exported to project mode with battery_limit = installed, so the project adds only its working layer and contingency. A dedicated HV/HTB substation or upstream grid reinforcement is in no source used here (IEA excludes it explicitly) and is not included; add it through the Customized CAPEX if your site needs one.
Market range Not applicable.
—CAPEX boundaryWith the default finance (5 %, 20 years) the LCOH spans about 61-267 EUR/MWh_th over the whole slider box (sizes 0.05-75 MW, 500-8,639 h, 60-184 EUR/MWh, both cases, customized CAPEX up to 400,000 EUR/MW); it passes 260 only for sub-MW boilers in 500-h flexible duty at the highest electricity price. Over every finance corner (0-10 %, 15-30 years) the span is about 61-308 EUR/MWh_th, the top being a 50 kW boiler run 500 h a year at 10 % over 15 years: these corners lie outside the 60-260 EUR/MWh_th bounds, which hold for every chart and test point: a boiler that small bought for a few hundred hours is a corner case, not a design. Below 1 MW and above 40 MW the CAPEX is extrapolated (flag output). Electricity prices below 60 EUR/MWh (spot hours) are outside the range: no delivered flexible-mode price was sourced.
Market range Not applicable.
—Validity domainThe gas benchmark counts gas and CO2 only, not the gas boiler's own CAPEX and O&M. It is the floor of the gas option: an existing gas boiler competes on this number, a new one adds its capital.
Market range Not applicable.
—Benchmark scopeAll costs in constant 2025 EUR, discounted at a real rate, with constant prices over the life. Nothing is escalated.
Market range Not applicable.
—Real terms convention